Andoni – Fish breeding farm River State Nigeria

Project details

This project deals with the design of fish farms for breeding\growing Tilapia and Catfish.

Palgey Maim carried out the general planning of the ponds, plumbing, structures, pumping facilities, etc and the detailed planning including piping, various systems, purchasing lists, etc.

The project includes 16 ponds with a volume of 300 cubic meters each – a total of 4,800 cubic meters, that were designed for growing 500 tons of fish per year.

The water needed for breeding the fish is pumped from the river (2,000 cubic meters per hour) and from wells, and is supplied to prefabricated fish ponds, produced and tested in Israel.

This project involved many challenges during the course of the work, and these among them were marine; working underwater on the pipeline below the river surface, working in high groundwater, large tidal differences, work in marshy terrain etc.

The river water is pumped directly to the fish farming pipe system, and the well water is conducted to the sedimentation pool

before being pumped to the well water pipe system. The drainage water is discharged into sedimentation pools for treatment before being returned to the river, in accordance with the quality required by local regulations.


The porject is based on:

pumping stations Planning
pumping stations Planning
Water supply planning
Water supply planning
Drainage water system
Drainage water system
Removal & sedimentation pools design
Removal & sedimentation pools design
Earthwork planning
Earthwork planning

Project info

Assigned workers

  • Rami Alon - Project Manager / Marine biologist
  • Eli Gertler - Purchasing supervisor
  • Jamal Gazi - Electricity designer
  • Gidi Zolkov - Structural engineer
  • Tzafrir Sofer - Designer
  • Saar Cohen - Designer

Client details

Client name

  • Shaul Moran International Consulting Ltd,
    Gonen Levi Holdings Ltd

Contact name

  • Mr. Rami Alon, Mr. Eli Gertler

Our Services

1
תכנון כללי ומפורט
2
פיקוח עליון בשטח
3
מענה לבעיות בשעת הקמת הפרויקט

Project pictures

Initial state – fallow field
Initial state – fallow field
Layout of the pumping station, Grow Out & 1st. nursery tanks
Layout of the pumping station, Grow Out & 1st. nursery tanks
Sedimentation basins excavation dealing with ground water
Sedimentation basins excavation dealing with ground water
View of Grow Out Tanks built in the project