Rearrangement of Harod Stream, extending 1700m up-hill on the outskirts of Rova Yizre’el neighborhood, in the city of Afula.
The terrain on both sides of the stream was initially fitted for rare cases of overflow. The project included earthworks, paving of service roads and concrete installations such as low-water crossings and Rip-Rap, in addition to a concrete bearing, measuring 2.20mX2.20m, with a length of 240m.
The porject is based on:
Project info
Assigned workers
- Avri Livne - Chief Planner
- Shirley Strogo - Planner
Client details
Client name
- Southern Jordan Drainage Authority
Contact name
- Anat Barzilai – chief Engineer of the Southern Jordan Drainage Authority
Our Services
1
The planning process included a hydrological analysis, hydraulic calculations, the preparation of alternatives with different geometric features and presentation in various committees
2
Design and construction of unique facilities
3
Publishing of tender and project supervision